PROJECTS

Alpine residence in Bavaria 

In the Alpine village in Bavaria, we have built an exclusive apartment residence designed for recreation.
Its environment is perfect for relaxation thanks to its clean and minimalist design, timeless materials and smart solutions. Take a peek inside the residence and see for yourself.

virtual tour
22 low-energy housing units in Germany

living area: 803 m²
investment volume: 10.5 mil

year of construction: approx. 1960

 
status: renovation, construction phase I

40 flats in a renovated listed building

 Our new project, which we are currently offering to investors, is a sensitively renovated listed building in Freising in which 40 separate residential units have been created.

About us

e-charging stations for cars and
e-bikes

9 luxury apartments and 5 senior apartments in Germany

In 2021, we started planning the renovation of an apartment complex in Germany with a total living area of 900 m². We will build 9 luxury apartments and 5 apartments for senior citizens. The total expected investment volume is
11 million Eur.
A park complex with a watercourse completes the atmosphere of a pleasant home.

5 parking spaces

e-charging stations for cars and
e-bikes

1,292 square feet to enjoy and linger in


 children’s play areas in sheltered
environment

parcel receiving box

fireplace
natural  pool
sauna

Spacious garden with a pond

Cosy benches surrounded by picturesque plants and flowers create an atmosphere of peace and relaxation.
Stepped paths run throughout the grounds, where you can stroll through the park and discover the beauty of nature.




On the paths around the park you can jog or walk while exercising and enjoying the fresh air. The entire area is surrounded by a green fence, which not only provides security but also beautifies the surroundings.
You can enjoy the beauty and silence of the park as well as nice microclimate.

One house, two maisonette apartments


House consists of two separate residential units.Its modern entrance areas, as well as the luxurious, high quality  equipment, catch the eye immediately.

 
Individual control  is possible via smart home. The entrance to the building is coded and protected by a code locking system and a video intercom system.

The community area consists of a garden with natural swimming pool, fireplace and barbecue house. A sauna with a whirlpool is an ideal place  for everyday relaxation.

Ten parking spaces and an charging station for electric cars and electric bikes is included.

Low-energy house

The property on offer is a house with efficiency level 40. A KfW efficiency house 40 meets the highest requirements in the field of energy efficiency. The house consumes a maximum of 40% of the primary energy (per year) compared to a corresponding reference house (with KfW 100 standard). The better the standard, the lower the energy costs. For example, the permitted annual primary energy demand for a KfW efficiency house 40 may be a maximum of 30 kWh per m².

Efficiency levels 40 and 40+ meet  the highest standard. A house in this class must be airtight and use renewable energy sources. The property on offer has a combination of ventilation system with heat recovery and wood pellet heating. In addition, the house has very good thermal insulation.

What stages of the project are ahead of us ?

We will guide you through all stages of the project.

1. Initial meeting 

At the first meeting, our goal is to understand the investor’s intentions and needs. The investor has one partner to communicate with for the entire duration of the project. He addresses all his requirements to that person. It  simplifies the whole process.

2. Contract preparation 

Project management, its organizational structure, begins to emerge, as well as
cost plan, timetable, human resources, site equipment and all other necessary details.

3. Building draft

The design includes architectural, layout and material solutions of the building. The investor’s intention is given a primary spatial form.

 4. Pre construction  documentation

Documentation prepared by professionals   saves time and money. It serves as a basis for building authorities and their assessment.

The aim is to obtain planning permission as quickly and smoothly as possible.

5. Construction  budget

Thanks to the BIM model, we can design the building to be as close as possible to the real construction and at the same time incorporate any changes in costs very quickly.

The budget is thus optimized and transparent. It facilitates the selection of the best material alternative.

6. Zoning decision

We will submit an application with complete documentation regarding all legal requirements and local conditions.
The opinions and statements of all authorities concerned are required. We will take care of all communication with the authorities.

7. Building permit

We efficiently represent the investor throughout the entire process, thus speeding up the process of obtaining a building permit.

8. Implementation project documentation

 This documentation helps to anticipate potential complications and deficiencies on site and to better analyse the need for materials by visualising construction details.

9. On site supervision

We take the utmost care to control the quality of the construction work to ensure trouble-free operation in the future.

10. Post construction documentation

Digital documentation facilitates the efficient management of the building, allowing any defects that would arise throughout the building’s lifecycle to be quickly rectified.

11. Property management 

 We  work with digital data in building management and have accurate information about the materials and products used.

This enables us to plan technical equipment inspections and keep buildings in perfect condition very efficiently.

12. Additional services

Throughout the process of cooperation with the investor, we support him according to his needs.
We can competently advise and help them, for example, with finding and buying suitable land for construction.

We provide construction, project, financial and contractor management.